女人一丝丝不挂,公与淑婷厨房猛烈进出,我的小后妈韩剧在线看免费高清版,精品无码一区二区三区

導航:全球石油化工網 >> 資訊頻道 >> 技術裝備

貝克石油工具公司的多層壓裂完井工具(英)

[加入收藏][字號: ] [時間:2009-01-15 JPT 關注度:0]
摘要:簡介:從致密頁巖層采氣通常需要大量資金投資在泵上,并且成功的機率很低。貝克石油公司開發出裸眼壓裂完井系統以改變這種局面,它能簡化壓裂操作步驟,并將不盈利的項目轉化成盈利。 Producing gas from tight ...
簡介:從致密頁巖層采氣通常需要大量資金投資在泵上,并且成功的機率很低。貝克石油公司開發出裸眼壓裂完井系統以改變這種局面,它能簡化壓裂操作步驟,并將不盈利的項目轉化成盈利。



Producing gas from tight shale formations typically requires major pumping investments with little guarantee of success. Baker Oil Tools aims to change this scenario with its Frac-Point Open-Hole Fracture Completion System, designed to simplify the fracturing process and turn otherwise unprofitable projects into moneymakers. 

Fracturing a horizontal, tight-gas well traditionally was done by either pumping frac fluid into the open hole and hoping for the best or isolating multiple zones by repeatedly cementing, plugging, perforating, and fracturing, a process that includes multiple trips, pumping trucks on standby for days at a time, and the expense and risk of perforating. 

Frac-Point is designed to improve this process in several ways. The system eliminates the costly cycle of cementing, plugging, and perforating, and it enables up to eight fracture placements in one trip, with a high degree of accuracy, the company says. The operator gains greater control of the frac treatment and a greater chance of fracturing the entire length of the lateral and increasing production. 

The system consists of four primary components: 

• The liner top packer, a hydraulic set permanent production packer with a tieback sleeve designed to carry up to 200,000 lb of liner assembly
• A short radius open-hole packer, featuring a patented antiextrusion packing element system
• Frac sleeves, including appropriately sized ball seats. The sleeves are actuated open sequentially by deploying balls from the surface, and the balls and seats are designed to be milled up to allow for a full opening production inner diameter to be maintained throughout the system, if needed
• Pressure-actuated sleeves, which are similar to the frac sleeves but do not contain a ball seat. 

The components work in tandem to isolate intervals of a horizontal section and pinpoint fracture treatment placement. Because it is a one-trip system, fracture treatments for each section can be pumped on the same day, which eliminates having to mobilize and demobilize pumping equipment. 

A major challenge of completing high-angle wells in open hole is getting tools through doglegs and other restrictions to total depth. The system’s packers are shorter for navigation through tight spots, and the company’s torque and drag software estimates the probability of reaching total depth. 

To determine the economic feasibility of a project, the company’s reservoir analysis team models different completion scenarios and estimates well deliverability for specific well parameters. The process takes into account factors like reservoir size, temperature, pressure, permeability, fracture properties and projected gas prices.


關鍵字: baker frac completion 
關于我們 | 會員服務 | 電子樣本 | 郵件營銷 | 網站地圖 | 誠聘英才 | 意見反饋
Copyright @ 2011 CIPPE.NET Inc All Rights Reserved 全球石油化工網 版權所有 京ICP證080561號
主站蜘蛛池模板: 奉新县| 温州市| 遂宁市| 大名县| 朝阳市| 凉城县| 天门市| 酒泉市| 临清市| 鹤庆县| 故城县| 泰兴市| 恩平市| 海南省| 永仁县| 白朗县| 高陵县| 天峻县| 中西区| 黄骅市| 拜泉县| 丰宁| 叶城县| 马公市| 东安县| 社旗县| 监利县| 文成县| 米林县| 灵川县| 武宁县| 五大连池市| 印江| 景洪市| 随州市| 正定县| 牟定县| 莆田市| 全南县| 肥乡县| 永新县|